Tonight was the first night all week that we didn't spend at Home Depot - so many loose ends needing to be tied. Exhausting.
Light, dazzling light
The electrician has been working in the paint-free zone (the second floor) getting lights installed. It's amazing how simply covering a light bulb seems to finish a room.
|
Lucy's shiny, girlie light. Even more fabulous than I thought. This is the Bel Air Metalic Ceiling Light from Lowes. |
|
This Portfolio Flush Mount from Lowes was the only decent looking fixture that we found that took a 100W traditional bulb. AND it was only $25! Score! |
Garage power!
Electric has been run to the garage and now lights have been installed.
|
We totally cheaped out on the garage lighting. Thanks to $5 jelly jar outdoor lights. Yup, they provide light. |
|
Oh no! We built on a fault line!!! Crap. |
Plumbing power!
Also in the paint free zone, the plumber is plumbing away. Things are coming together, pieces here and there.
|
The first piece of the master shower is in place. |
|
This Kohler Kelston faucet was scored on Craigslist for $50. |
|
Finally ready for plumbing! The backsplash was installed now that it is thinned down and sinks installed. |