Tonight was the first night all week that we didn't spend at Home Depot - so many loose ends needing to be tied.  Exhausting.

Light, dazzling light
The electrician has been working in the paint-free zone (the second floor) getting lights installed. It's amazing how simply covering a light bulb seems to finish a room.

Lucy's shiny, girlie light.  Even more fabulous than I thought.  This is the Bel Air Metalic Ceiling Light from Lowes.  

This Portfolio Flush Mount from Lowes was the only decent looking fixture that we found that took a 100W traditional bulb.  AND it was only $25!  Score!


Garage power!
Electric has been run to the garage and now lights have been installed.  


We totally cheaped out on the garage lighting.  Thanks to $5 jelly jar outdoor lights.    Yup, they provide light.  

Oh no!  We built on a fault line!!!  Crap.

Plumbing power!
Also in the paint free zone, the plumber is plumbing away.  Things are coming together, pieces here and there.  

The first piece of the master shower is in place.  

This Kohler Kelston faucet was scored on Craigslist for $50.

Finally ready for plumbing!  The backsplash was installed now that it is thinned down and sinks installed.  