The main floor floors have been sanded and poly'd. The brief glimpse that I was able to see, the floors were still wet so it was difficult to get close. Since taking this picture, they have been covered so this is as good as it is going to get for a while.
|
The birch floors are looking pretty sharp! |
I had a quick meeting with the carpenters this week to plan the closets. Kind of fun! I am so used to small, limited closets. I think I will need to acquire a clothing habit to fill mine...
|
Andy's closet, room for a dresser and way more hanging space than he'll need. |
|
Kid #2's closet - shelves and 2 hanging bars. |
|
The built ins in the loft area. Kid's books and toys coming soon! |
Tiling has begun in earnest, too. Paul the tile guy is starting in the Master Bath. The shower seat is now installed, backer board is in the shower and on the floor. Tomorrow I have a quick meeting to finalize tile layout, then we just wait and watch.
|
Master shower coming along! |
Just like Legos, the kitchen cabinets are moving into place. The scale of the space is still hard to imagine. The cabinets just seem so tiny.
|
The island generally in place, give or take 3 feet. |
A look out the back window shows some good progress with the garage. The slab was poured today. Finally able to see what the final sight lines will be - I think it will give us privacy where we need it, but still give us good views.
Finally, we are now able to get into the basement. Yippee!
No comments: