Monday, March 26, 2012

I'm floored

The biggest update from the last week had been the pouring of the basement floor. Large in scale, but difficult to see since there are no stairs to the basement yet.  Other work was completely invisible, such white primer in the upstairs and a little mudding and sanding on the first floor.

Taken while hanging off a ladder with one arm.  Impressed?

That is, until today!  The wood floors were installed today on the 2nd floor today.  Three inch common (rustic) birch will run in the upstairs hallway, master bathroom and master closets.

The pre-sanded floors in the master bedroom.

Unimpressed that the floors end at her bedroom door.  Sorry, kid. 
Work was intense this weekend getting the current house ready for sale.  Two SmartBoxes surely can hold a lot of stuff, enough to require lots of Advil.  Listing is still on schedule for this Thursday.

Packed.  Full.





No comments:

Post a Comment